Access to contracts
Transmission contract
The transmission contract is made up of sections applicable to all shippers and optional sections. Optional sections allow you to sign a suitable contract for their transmission needs.
The main possible combinations are described in the attached document.
>> Main possible combinations schema
The contract is signed electronically via the Sign@air application. See the memo.
The transmission contract documents applicable from April 01 2024 are:
Documents
- Contract – version of April 1st, 2024 [new]
- Section A – General terms and conditions from April 1st, 2024 [new]
General terms and conditions from November 1st, 2023 - Section B – Upstream network from April 1st, 2024 [new]
Upstream network from November 1st, 2023 - Section C – Downstream network from January 1st, 2024
Downstream network from September 1st, 2023 - Section D1 – Access to title transfer points from April 1, 2024 [new]
Access to title transfer points from April 1, 2023 - Section D2 – Title transfer point and balancing from April 1st, 2024 [new]
Title transfer point and balancing from April 1st, 2023
- Appendix to section A:
- Appendix A1 - Definitions from November 1st, 2023 [new]
Definitions from November 1st, 2023 - Appendix A2 - First demand payment guarantee
- Appendix A3 - Evidence agreement model
- Appendix A4 - Technical requirements
- Appendix A1 - Definitions from November 1st, 2023 [new]
- Appendixes to section B
- Appendix B2 - Interruption methods of upstream network capacity
- Appendix B5 - Buy-back procedure
- Appendix B6 - Capacity substitution service provision from December 1, 2017
- Appendix to section C
- Appendix C1 - Interruption procedures of downstream network capacity
- Appendix to section D1
- Appendix D1.1 - Operational procedures
- Appendix à la section D2
- Appendix D2.1 - Operational procedures